Equipment and instrument installation

Any installation of equipment and/or instruments must receive prior approval of the GI Operations Manager. Environmental control inside the buildings, vaults, etc., is very important, especially in the area of temperature stabilization. Any heat-generating equipment must be evaluated to determine total impact on the facilities and projects. Any use of unsealed batteries that could leak vapors generally will not be permitted unless in a well-ventilated area. All batteries must have protective covers to avoid shorts and/or sparks and for safety purposes.

See caution statement in Project Area Designation section.